CDC 2 Kidderminster Hospital

CDC 2 Kidderminster Hospital

The CDC 2 Kidderminster was a fast tracked electrical project respectfully working in conjunction with various other trades whilst adhering to the project programme.  All aspects of the electrical installation have been carried out to a high standard as to comply to BS7671: 2018 and as per the installation drawings provided by EXI. Electrical: Mechanical: … Read more

Finchley Memorial Hospital MRI Suite 2

Finchley Memorial Hospital MRI Suite 2

Finchley Memorial Hospital MRI Suite 2 is a specialized facility within Finchley Memorial Hospital that is dedicated to providing magnetic resonance imaging (MRI) services. MRI is a non-invasive imaging technique that uses powerful magnets and radio waves to create detailed images of the body’s internal structures. MRI Suite 2 is equipped with state-of-the-art MRI machines … Read more

 Alexandra Hospital Theatres

Alexandra Hospital

The Alexandra theatres was a fast tracked electrical & mechanical project delivering crucial services on time for the people Redditch, whilst respectfully working in conjunction with various other trades and adhering to the project programme.   This project provided new Endoscopy facilities serving two new operating theatres.  A temporary corridor was created to enable the … Read more

Kidderminster Hospital – Endoscopy

KIDDERMINSTER HOSPITAL – ENDOSCOPY

Working with our client Interclass these works formed part of the government’s £350 million investment across the UK into community based diagnostic centres. This project was both Electrical and Mechanical works of which the installation consisted of a brand new, three room Endoscopy unit at Kidderminster Hospital and Treatment Centre. The new unit has increased … Read more

Harplands Hospital – Domestic Hot water Remedial works

HARPLANDS HOSPITAL Domestic Hot water Remedial works

Harplands Hospital is a mental health facility in Stoke-on-Trent operated by the North Staffordshire Combined Healthcare NHS Trust. Working alongside our Client Interclass this Project consisted of delivering a much improved domestic hot water system in both terms of circulation and delivery. Our Installation consisted of 2 new Andrews gas fired water heaters, new pipework … Read more

Kent and Canterbury IR Laboratory

Kent and Canterbury IR Laboratory

E H Humphries designed and installed all electrical services to a new Siemens Artis Pheno Interventional Angiography Scanner, adjacent treatment areas, technical Rooms and Control areas Systems installed included: The project was particularly difficult as it was within a live area of the hospital , most of the works were within a secured site boundary … Read more

The Wildwood Pub

The Wildwood Pub

Completed March 2023 E H Humphries worked alongside their Sister company Tudorworth Properties Ltd to deliver a bright and bold transformation on the Sizzling Pub, the Wildwood in Staffordshire. The refurbishment project aimed to enhance the overall ambiance of the pub while ensuring the safety and efficiency of its electrical systems. One of the main … Read more

Eastfield Arms Barnsley

EASTFIELD ARMS BARNSLEY

Working together with our repeat client Mitchells and Butlers PLC, EHH undertook electrical works to refurbish an existing Sizzling pub and grill. Works included external lighting decorations, new internal lighting, combining our efforts along with the principal contractor and various other trades team on a fast paced project. Over a four-week period the project was … Read more

20-Bed Modular Ward, Nottingham University Hospital

E. H. Humphries worked as a subcontractor to Darwin Group and were instructed to complete full electrical and mechanical installations [DC1] for a new modular ward block at Nottingham University Hospital.  In addition to the above, we were tasked with the refurbishment of a nearby redundant plant room in order to install steam generating plant to … Read more